Fibre Optic London O2 Arena – Sky Bar
Client: Alpha Bristol | Sector: Fibre Optic Cabling -Events | Duration 1 Month
Fibre Optic Cabling
for the Audio Visual Cabling requirements throughout the SKY bar at the
O2 Arena in London. A vast amount of fibre optic cabling was used to
run the screens, projectors and audio visual equipment
NM Cabling were tasked with terminating, testing and setting up all
the fibre optic cabling throughout the bar and entertainment area.
There was also a Cat6 cabling requirement throughout for local cabling and controls
The work had to be carried out under strict time-scales, health and safety and access requirements.
Fibre optic cabling terminations were undertaken in the main
communications area and off access towers in the main areas due to the
height that the projectors and screens were mounted, creating a
challenging installation
Fibre Optic -O2 Arena – Sky Bar, London – See the full Case study
Sing up to our newsletter for updates and more case studies http://www.nmcabling.co.uk/signup-to-our-newsletter/