Luxury Yacht Installation - Update

Wellesley Yacht Project


The Wellesley Yacht has now had its 1 month settling in period, and its unveiling at the MIPIM Property show in Cannes. As part of the project a final fine tuning visit is to happen next week to change the levels of the music to suit the Yacht now that it is fully fitted out. There has also been an addition of a Hard Top where additional speakers are to be installed and which need to be set up onto the central music system

Liaising with the navigation and satellite tracking engineers the TV systems and entertainment will also be double checked and amended where necessary


The Yacht will then be fully complete

Contact NM Cabling  for a free Data cabling review or survey  01923 888588

No comments:

Post a Comment